Prospect analysis and pre-feasibility
A first technical and economic answer before committing the investment.

Service 01 · Grid connection studies
A new plant or load is not built until it is proven the grid can take it. A weak study turns into observations, months of delay and an investment that starts paying back late.
The question you bring
Who it is for
What is included
A first technical and economic answer before committing the investment.
Distributed generation, self-generation and storage connected to distribution or transmission.
Maximum and minimum demand, N-1 criteria, fault levels and equipment ratings.
Models in DIgSILENT PowerFactory and CYMDIST, with scenarios and dynamic behavior.
File, forms and answers to observations until approval.
Deliverables
Process
Project and connection-point data with a clear checklist.
Grid and plant model in PowerFactory or CYMDIST.
Demand, fault and contingency scenarios.
Two engineers validate results and conclusions.
Report, walkthrough and support with observations.
Experience
100MW
PV + BESS
Feasibility study to connect one of the country’s first solar plants with batteries to the transmission system.
Ecuador · National Transmission System · 2025
10MW
69 kV substation
Preliminary feasibility to connect a solar plant to the utility’s sub-transmission grid.
Guayas · Sub-transmission grid · 2026
FAQ
Nobody can: it depends on the operator. We do guarantee a rigorous study, in the right format, and support until every observation is answered.
It depends on size and available information. With the quote you get a staged schedule with deadlines we meet.