Power grid · 2024
14 h
of daily blackouts on the worst days.
Electrical engineering · Ecuador
Grid connection studies, power quality, solar PV generation and electrical design, so your investment moves forward on data, not assumptions.
Software and equipment we work with

MATLAB
Why now
The question is no longer whether to invest in energy, but how to do it without getting it wrong.
Power grid · 2024
14 h
of daily blackouts on the worst days.
Premium diesel · USD per gallon
$3.11
+73 % since 2025
2026 · New rules
Over 54 MW of distributed generation already connected to CNEL.
Sources: CNEL EP, Ministry of Energy, ARCONEL 2026 Regulatory Plan. Diesel: market reference.
What is your case?
Each profile comes with a different question. Start with yours.
Solar farm investors and developers 01 Grid connection studies
Connection and feasibility studies, and utility permitting.
You getConnection study
See service
Plant engineers and supervisors 02 Power quality
Power quality, protection and continuity of operations.
You getContinuity plan
See service
Commercial and industrial managers 03 Solar PV generation
Solar and batteries for savings and backup, with calculated payback.
You getCash flow and IRR
See service
Construction project managers 04 Electrical design
Design, calculation reports and drawings ready for review.
You getApprovable drawings
See service
How we think
Every technical figure is translated into risk, timeline, investment and payback.
What engineering says
Load flowShort circuitHarmonics · THDGrid CodePowerFactory simulationWhat management needs
RiskWhat can go wrongTimelineWhen it will be readyInvestmentWhat it costsPaybackWhen it pays offComplianceWhether it gets approvedEngineering and economics
Whether it works technically and whether it makes economic sense: always both.
Reference example · 278.7 kWp solar plant
Run the first numbers yourself:
Our impact
Real team cases. No client names, for confidentiality.
01/06
Feasibility study to connect one of the country’s first solar plants with batteries to the transmission system.
Grid connection studies 100 MW · Grid connection feasibility for a solar plant with storageEcuador · National Transmission System · 2025 01
Grid connection studies 10 MW · Preliminary feasibility to connect a solar plant at 69 kVGuayas · Sub-transmission grid · 2026 02
Solar PV generation 837 kWp · Electrical installation and interconnection of an industrial PV plantCentral highlands · Industrial sector · 2026 03
Power quality 278.7 kWp · Energy diagnosis of a factory with solar generationEcuador · Manufacturing · 2026 04
Solar PV generation 6 kWp · Residential hybrid solar system with batteriesGuayaquil · 2026 05
Electrical design 1 VE · Electric vehicle charging infrastructureGuayaquil · 2026 06 Why Power Dynamics
Utility standards, ARCONEL and the Grid Code in every deliverable.
Every study states what it costs, what it saves and when it pays back.
PowerFactory, CYMDIST and PVsyst with models of your real grid.
From study to installation: your project never changes hands.